Sun-microsystems StorEdge 6900 Series Manual do Utilizador Página 124

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 123
108 Sun StorEdge 3900 and 6900 Series Troubleshooting Guide March 2002
Notes
When inserting a loopback connector into the T Port, there will be NO green light
indicating a proper insertion. However, the test will run and be valid. There is
currently an RFE to address this issue.
If only one of the links has failed and the I/O is travelling over the remaining
link, once the failed link is replaced and recabled, I/O will be automatically be
routed over the repaired link by the switch. No manual intervention is required.
If both links have failed and a LUN failover has occured, after repairing the links
and recabling them, the user will have to manually perform a ’mpdrive failback’
to return the paths to their optimal state. I/O will then resume as normal over
the T Ports.
T1/T2 Isolation Procedures
1. Run linktest from the Storage Automated Diagnostic Environment for a guided
isolation procedure.
2. After replacing the failed FRU, run mpdrive failback, if needed.
Vista de página 123
1 2 ... 119 120 121 122 123 124 125 126 127 128 129 ... 161 162

Comentários a estes Manuais

Sem comentários